Thursday, January 8, 2009
Rosedale work continues
I've continued to work in Rosedale; in the right foreground, I have planted several rows of potatoes along the edge of the layout. On the right, in the background, you can see where the Rosedale station has ben relocated--I have added a fairly lengthy station platform. And on the left, I have scratchbuilt an additional potato house--that makes five along the siding in Rosedale, along with the Irving bulk plant. 
Saturday, December 27, 2008
Rosedale upgrade
Sunday, December 14, 2008
More Moncton photos
Here are a couple more photos of the Moncton operating crew on Saturday, December 13. Below, Milne is operating the Carleton-York peddler as it crosses the Rosedale Road between Waterville and Rosedale. Milne was especially adept at the prototypical use of the locomotive's horn at the highway crossings.
In the photo below, while yardmaster Mike finishes making up the "Newbridge Turn", Jim waits to take the train out of the Avondale yard.
Saturday, December 13, 2008
Moncton Operators, Northampton Train
Although operating sessions have been rare lately, a group of five Monctonians operated a busy schedule over the Carleton Railway on Saturday, December 13. One of the highlights of the day was the arrival of #24 (the Northampton mixed train) at the end of the day. The unexpectedly long train, with engineer Milne and brakeman Murray, brought five loads of logs to Patterson's mill, a tank car for the Esso bulk plant, a hopper load of ballast to be used by the track gang, and several empty freight cars for loading at the local industries. At the end of the train was the rejuvenated heavyweight coach Muniac filled with workers for the mill.
The above photo shows RSD-15s 2416 and 2417 at the front of the Northampton mixed train as it pulled into the bustling community. Although the yard tracks resemble a switching puzzle, the crew ably spotted the various freight cars at local industries in short order.
Above, John works as yardmaster in South Newbridge. As always, South Newbridge was a very busy spot with a lot of cars to deliver to local industries.
Murray is the engineer on today's Fast Freight West. In the above photo, he is switching cars in the Millville Yard before departing toward Avondale. This was Murray's first visit to the Carleton Railway.
Although there have been few operating sessions this fall, the Carleton Railway has been a busy place: I have been troubleshooting some of the track trouble spots, working to improve the reliability of the freight car fleet, adding more scenic details, and making changes to the timetable. I still have a few projects to complete, so regularly scheduled operating sessions won't begin again until March 2009 (celebrating the third anniversary of operations on the layout).
Sunday, November 9, 2008
Parade Marks Opening of Overpass
The past weekend marked two major milestones for the Carleton Railway. The Carleton Railway took part for the first time in the Saint John club's annual show. Four modules depicting the Carleton Railway's Monticello, Maine freight yard and interchange with the BAR were part of the club's modular layout. An Alco S4 was busy all day switching cars in the yard, while an Alco C424 took its turn on the main line. Even a trio of the railway's vintage Geeps--the only GMD units ever owned by the Carleton Railway--were brought out of retirement for use on the Aroostook subdivision.
Then on Saturday evening, at a special operating session manned by an enthusiastic crew from Nova Scotia, the first train operated across the newly completed Northampton subdivision. The train travelled under the "Hiram T. Myshrall Overpass" just after the parade that officially opened the community-saving structure. In the photo below, obtained from the News-Advertiser's ace reporter Freda Mulheron, local politician and community hero Hyram Myshrall waves to the grateful residents of Pembroke as he sits in the first car to cross the new bridge at the front of a giant parade in his honour (click on photo to enlarge).
Friday, October 31, 2008
Module Progress
Here is a very brief update regarding the Carleton Railway's Monticello, Maine freight yard / BAR interchange modules that I have begun constructing. The first photo shows the wiring crew making sure that everything works well electrically. The overview of the four modules in the lower photo shows the track ballasted and some basic ground cover installed. I still have a week to get the module ready to be part of the SJSMRR modular layout. I hope to add a few more scenic details, and I will also install the backdrops. Obviously I will still have lots of work to do in the coming year to make it look complete for the fall 2009 show, but at least it will be in place and operational for this year's show.
The gray ballast represents the Carleton Railway's Aroostook subdivision mainline (the far end toward Avondale, and the near end toward Montreal) and freight yard. The brown ballast represents the BAR, which crosses the Carleton Railway at Monticello, Maine (the far end toward Presque Isle [Blake's yet-to be-completed modules] and the near end toward Houlton).
Saturday, October 4, 2008
Monticello Yard Construction
The first track has been laid for the Carleton Railway's Aroostook Subdivision, which has to this point existed only as staging in the basement furnace room. With help from Bob Kane and Bruce Bosence, all of the track has been laid on the four modules that will represent the interchange betwen the Carleton Railway (double-track mainline at the front) and the BAR (single track mainline at the rear that crosses the CR mainline in the foreground) in Monticello, Maine. The Carleton Railway will provide a yard crew (an S-4) that will be kept busy with industrial switching and interchange trafic. A small yard between the two railways should provide ample space for sorting freight cars and making up trains.
The various tracks can be seen more clearly in the view below; the yard lead is at the far end (just inside the double track mainline). The BAR mainline is located so it can connect at the far end with Blake Wooley's BAR modules at Presque Isle (hurry up and get those done, Blake!), and then Blake's modules will connect to Bob Henry's Aroostook Valley Railway at Caribou, which then connects to Bob Kane's Aroostook River Railway at Washburn Jct. All together, the modules will provide an operating Aroostook County layout that will be more than 40 feet long; the two tracks in the foreground can operate independently of the rest of the modules, so at SJSMRR shows the Aroostook County modules can be operated in a prototypical manner without interfering with the trains that are traversing the mainline.
An additional inner track at the southern end is available in case someone wants to entend the operations-oriented modules (anyone want to model Houlton, Maine?).
The SJSMRR Fall Show will be held on November 8 at the Lion's Club (right behind Ken-Val Co-op) in Quispamsis, and the Carleton Railway will be there!
The SJSMRR Fall Show will be held on November 8 at the Lion's Club (right behind Ken-Val Co-op) in Quispamsis, and the Carleton Railway will be there!
Subscribe to:
Posts (Atom)