Although operating sessions have been rare lately, a group of five Monctonians operated a busy schedule over the Carleton Railway on Saturday, December 13. One of the highlights of the day was the arrival of #24 (the Northampton mixed train) at the end of the day. The unexpectedly long train, with engineer Milne and brakeman Murray, brought five loads of logs to Patterson's mill, a tank car for the Esso bulk plant, a hopper load of ballast to be used by the track gang, and several empty freight cars for loading at the local industries. At the end of the train was the rejuvenated heavyweight coach
Muniac filled with workers for the mill.
The above photo shows RSD-15s 2416 and 2417 at the front of the Northampton mixed train as it pulled into the bustling community. Although the yard tracks resemble a switching puzzle, the crew ably spotted the various freight cars at local industries in short order.
Above, John works as yardmaster in South Newbridge. As always, South Newbridge was a very busy spot with a lot of cars to deliver to local industries.
Murray is the engineer on today's
Fast Freight West. In the above photo, he is switching cars in the Millville Yard before departing toward Avondale. This was Murray's first visit to the Carleton Railway.
Although there have been few operating sessions this fall, the Carleton Railway has been a busy place: I have been troubleshooting some of the track trouble spots, working to improve the reliability of the freight car fleet, adding more scenic details, and making changes to the timetable. I still have a few projects to complete, so regularly scheduled operating sessions won't begin again until March 2009 (celebrating the third anniversary of operations on the layout).
1 comment:
Steve
Nice to see the Carleton Railway moving again with visiting crews. Maybe someday your regular crews will get to move freight again.
Waiting to see what changes you are making in the Schedule.
later
Doug
Post a Comment